O desafio
At the inside of the pipe walls a lot of limescale settled over the time. This reduced the pipe diameter and lowered the flow rate. Therefore problems occurred upstream. Initial deposit layer measured approximately 50mm thick.
A solução Merus
Installation of two Merus Rings - one at the pipeline beginning and one directly after the pump - to treat effluent water without adding chemicals.
Resultados
→At 6 months: calcium layer reduced from approximately 50mm to 25mm thick. At 12 months: only few deposit left, some areas are completely free of limescale. Total inner diameter increase of 70mm achieved. Flow rate stabilized
→new deposit formation stopped.