面临的挑战
At the inside of the pipe walls a lot of limescale settled over the time. This reduced the pipe diameter and lowered the flow rate. Therefore problems occurred upstream. Initial deposit layer measured approximately 50mm thick.
Merus 解决方案
Installation of two Merus Rings - one at the pipeline beginning and one directly after the pump - to treat effluent water without adding chemicals.
成果
→At 6 months: calcium layer reduced from approximately 50mm to 25mm thick. At 12 months: only few deposit left, some areas are completely free of limescale. Total inner diameter increase of 70mm achieved. Flow rate stabilized
→new deposit formation stopped.